Loading...
Loading...
lone-cypress-energy-finalises-feed-study-for-its-blue-hydrogen-project-in-california
lone-cypress-energy-finalises-feed-study-for-its-blue-hydrogen-project-in-california

Lone Cypress Energy finalises FEED study for its blue hydrogen project in California

Lone Cypress Energy Services has announced the completion of the front-end engineering design (FEED) study on its California hydrogen project.

The company now anticipates reaching a final investment decision (FID) before the end of 2023, expected to start up in Q4 2025.

Located at the Elk Hills Field in Kern County, the Lone Cypress Hydrogen Project study encompassed a 65 metric tonne per day steam methane reformation plant, with an integrated hydrogen liquefaction, storage, dispensing and a post combustion carbon capture system and all associated balance of plant infrastructure.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...