Loading...
Loading...
sinnewetterstof-hydrogen-pilot-project-moves-forward
sinnewetterstof-hydrogen-pilot-project-moves-forward

SinneWetterstof Hydrogen Pilot Project moves forward

A first-of-its-kind project that will test the extent to which a hydrogen electrolyser can follow the generation profile of a solar plant has taken a step forward.

BayWa r.e. and its Dutch subsidiary GroenLeven have signed a contract with the Netherland’s largest network company Alliander for the operation of the SinneWetterstof Hydrogen Pilot Project.

Being built by Alliander, the project is designed to test how local hydrogen production can follow the generation profile of a solar plant, ultimately to reduce grid congestion.

Expected to be operational by late 2021, the project will source energy from the adjacent 50 MWp solar farm, previously built by GroenLeven, to generate green hydrogen as a storable form of energy by electrolysis of water.

... to continue reading you must be subscribed

Subscribe Today

Paywall Asset Header Graphic

To gain access to this article and all our other content, you will need to subscribe to H2 View.

From the latest print editions, to 24/7 online access to exclusive interviews, authoritative columnists and the H2 View news archive, a subscription is the best way for you to stay up to date with developments in the hydrogen community.

Please wait...